The Ferrybridge 132kV Battery Energy Storage System (BESS) required delivery within a highly regulated and technically complex environment. The project had to meet strict Grid Code compliance and G99 requirements while ensuring seamless integration between the BESS, substation infrastructure, and third-party network operators.
A key challenge was achieving a safe, efficient, and coordinated interface design within a high-power density environment while maintaining full operational reliability.
We delivered a complete 132kV electrical and civil design package, including system studies, layouts, and fully coordinated interface designs compliant with Grid Code and G99 standards.
Our scope included:
The Ferrybridge project demonstrated robust 132kV engineering capability, integrating high-voltage design, civil works, and advanced control systems. From initial calculations to final handover documentation, the project maintained full compliance, safety, and performance integrity throughout.