The Gonerby 132kV/33kV Substation project required the rapid deployment of a high-voltage SCADA system capable of supporting real-time monitoring and control for the network operator.
The key challenge was to fast-track delivery while integrating complex multi-protocol communication and multi-layer physical connections with downstream protection and control devices, all within a tightly constrained programme.
EVOSYS led the supply, engineering, and commissioning of a fully integrated HV SCADA system designed to deliver real-time operational visibility and control.
Our engineering team developed a robust SCADA architecture capable of native processing across multiple communication protocols, ensuring seamless interoperability with diverse IEDs and substation equipment.
We carried out detailed SCADA hardwired interface engineering, including comprehensive I/O mapping for protection and control systems, ensuring full system alignment across all devices.
A rigorous Site Acceptance Testing (SAT) phase was executed by our commissioning specialists, including point-to-point verification, database validation, and HMI testing to ensure full operational readiness prior to energisation.
The Gonerby 132kV/33kV SCADA system was delivered on schedule, providing the client with a reliable, future-proof control platform.
By replacing manual monitoring processes with advanced SCADA automation, EVOSYS significantly improved fault response times, operational efficiency, and overall grid resilience.